OPENING PATH
How does opening a QDOBA Mexican Eats franchise work?
5–18 months
Official FDD estimate for an existing-structure conversion
For a traditional QDOBA restaurant created by converting an existing structure, the 2025 FDD estimates five to eighteen months from site acceptance to opening. It is an estimate, not a guaranteed or contractual total, and non-traditional sites may take longer. The binding path runs through qualification, disclosure and agreements, site and lease approval, design and permits, buildout, training, readiness checks, written opening authorization, and the applicable opening deadline.
Data basis. Legal franchisor: Qdoba Franchisor LLC; direct parent: Qdoba Funding LLC. FDD issuance date: December 9, 2025. Formats reviewed: traditional single-unit Franchise Agreement, Development Agreement for development rights, and non-traditional License Agreement. Timeline mode: Mode A — official total timeline for an existing-structure conversion; the FDD does not give a separate complete total for non-traditional sites. Evidence used: 2025 FDD Items 1, 5–12, 15–17 and 20; Franchise Agreement §§4–9 and insurance/lease exhibits; Development Agreement §§2, 5–7; License Agreement §§1, 4–6. Checked July 19, 2026.
Official public references: QDOBA franchise website, QDOBA ownership requirements, QDOBA franchise FAQs, and the FTC consumer guide to buying a franchise. The FDD is cited below by year, Item, agreement section, and page because no matching franchise-controlled public FDD URL was verified.
14 days
Federal FDD review floor
Calendar days before signing or paying.
30 days
Single-unit site response
Best-efforts target after a complete package.
45 days
Development-path site response
Best-efforts target under the Development Agreement.
120 days
Possession after site acceptance
Acceptance may be retracted if possession is not obtained.
9 months
Traditional opening deadline
From Franchise Agreement execution, unless another schedule controls.
QUALIFICATION
What must a prospective QDOBA franchisee qualify for before approval?
QDOBA’s current public qualification page says an applicant must have at least $350,000 in liquid capital and $1,000,000 in net worth to be considered, while its FAQ states that applicants planning three or more restaurants need $500,000 in liquid capital and $1,500,000 in net worth. The site describes multi-unit restaurant, retail, hospitality, or commercial-development experience as preferred rather than required. Meeting these screens does not create a right to approval.
The current marketing page also says QDOBA seeks candidates committed to opening at least two restaurants. The 2025 FDD, however, legally describes a single-unit Franchise Agreement and states that two or more restaurants require a Development Agreement; the Development Agreement itself can contain a case-specific Minimum Development Quota. A buyer should therefore verify the structure QDOBA is actually willing to award in the target market rather than assuming the public marketing screen and contract structure are identical.
Format difference
Traditional restaurants use the Franchise Agreement. A developer receives a Development Area and schedule under a Development Agreement, then signs a separate then-current Franchise Agreement for each restaurant. Airports, universities, military installations, casinos, transportation facilities, and similar non-traditional venues may use the License Agreement, whose terms may be negotiated for the facility. Source: 2025 FDD, Item 1, pp. 2–3.
Financial screen: confirm the liquid-capital and net-worth threshold for the ownership group and unit count.
Application package: complete the package for the intended site type and sign QDOBA’s non-disclosure agreement.
Management plan: multi-unit developers must identify a QDOBA-approved Designated Operator with qualifying experience.
Entity documents: be ready to disclose ownership and sign required guaranties and confidentiality/non-competition documents.
Sources: 2025 FDD, Item 1, p. 2; Item 15, pp. 43–44; Development Agreement §§6.6–7. Current qualification thresholds: QDOBA “What It Takes” and QDOBA FAQs.
VERIFIED ROADMAP
What are the actual steps from inquiry to opening?
The sequence below follows the 2025 FDD and attached agreements. Some activities can overlap, particularly financing, real estate, design, permitting, hiring, and training, so the durations should not be added together as a guaranteed project schedule.
Candidate and disclosure phase
1
Submit the inquiry and pass QDOBA’s qualification screen
Action: Provide territory, ownership-group financials, and the requested application information; complete the site-type application package and NDA.
Actor: Applicant; QDOBA decides whether to continue evaluating the candidate.
Timing: No complete application-review duration is disclosed.
Blocker: Failure to meet QDOBA’s current financial or organizational screening criteria.
2
Receive and review the FDD before any binding franchise sale step
Action: Review the FDD, Franchise Agreement, Development Agreement or License Agreement, guaranties, lease addendum, and state addenda that apply.
Actor: Applicant; Qdoba Franchisor LLC supplies disclosure.
Timing: At least 14 calendar days before signing a binding agreement or paying the franchisor or affiliate.
Next dependency: Agreement execution and any payment trigger must wait until the federal disclosure period is satisfied.
Agreement, territory, and real-estate phase
3
Sign the agreement structure that matches the development path
Action: Execute the applicable Franchise Agreement, License Agreement, and, for multi-unit development, Development Agreement and related guaranties.
Actor: Applicant/franchisee and Qdoba Franchisor LLC.
Timing: Development fees are triggered at Development Agreement signing; franchise or license fees are triggered at agreement execution.
Blocker: Contract terms, state addenda, ownership guarantees, or an unresolved development schedule.
4
Obtain written site acceptance without confusing it with territory protection
Action: Submit the Real Estate Committee Package; developers must first submit a Market Plan for the Development Area.
Actor: Franchisee/developer proposes; QDOBA accepts or rejects in writing.
Timing: Best efforts: 30 days for a Franchise Agreement site; 45 days under the Development Agreement after a complete package or later requested materials.
Blocker: Incomplete demographics, plans, financial information, letter of intent, or a site that does not meet then-current criteria.
5
Secure the site and lease on the required timetable
Action: Put the accepted site under contract by the Site Under Contract Date; submit the proposed lease before signing and use best efforts to obtain the QDOBA Lease Addendum.
Actor: Franchisee/developer, landlord, and QDOBA for required review or consent.
Timing: If legal possession is not obtained within 120 days after Notice of Site Acceptance, QDOBA may retract acceptance.
Blocker: Lease terms, landlord refusal, financing, or missing the Site Under Contract Date.
Design, buildout, and training phase
6
Complete QDOBA design approvals before construction and permitting milestones
Action: Use an approved licensed architect/engineer, obtain concept and schematic approval, submit final construction and signage plans, then obtain required zoning, permits, insurance, and a licensed general contractor.
Actor: Franchisee, architect, contractor, government authorities; QDOBA approves brand plans.
Timing: Construction starts only after required plan approvals; local permit durations are not standardized in the FDD.
Blocker: Plan revisions, zoning, utility conditions, permits, insurance, contractor scheduling, or municipal inspections.
7
Run management training in parallel with the opening schedule
Action: Complete certified training for the Designated Operator, General Manager, and two additional leaders; three of the four must have direct day-to-day operational responsibility.
Actor: QDOBA provides the certified program; the franchisee supplies trainees and trains remaining team members.
Timing: DO training is about 7 weeks/315 hours and begins about 28 weeks before scheduled opening; GM and two additional leaders should begin at least 12 weeks before opening.
Blocker: Failure to complete training to QDOBA’s satisfaction before opening.
Readiness and authorization phase
8
Prove the restaurant is operationally and legally ready
Action: Finish construction, obtain operating permits including certificate of occupancy and health permits where applicable, activate approved technology, order through approved suppliers, install required equipment/signage, staff leadership roles, and provide insurance evidence.
Actor: Franchisee, suppliers, contractors, insurers, and government authorities.
Timing: QDOBA states it will not dispatch pre-opening staff until operating permits are received.
Blocker: Missing permits, incomplete systems configuration, training gaps, staffing, nonconforming buildout, or insurance documentation.
9
Receive written opening authorization, then open within the contractual window
Action: Obtain QDOBA’s written authorization to open after compliance checks; opening assistance for the first two restaurants is provided as QDOBA deems advisable and is subject to personnel availability.
Actor: QDOBA authorizes; franchisee opens and operates.
Timing: Traditional restaurant: within 15 days after authorization and within 9 months after Franchise Agreement execution, unless another agreement schedule controls.
Blocker: QDOBA has not issued written authorization or a Development Agreement deadline has not been met.
Roadmap sources: 2025 FDD Item 1, p. 2; Item 11, pp. 28–36; Item 12, pp. 39–41; Franchise Agreement §§4–9; Development Agreement §§6.1–6.6; License Agreement §§1, 4–6. Federal timing: FTC Franchise Rule.
NON-TRADITIONAL
How does the non-traditional QDOBA opening path differ?
A non-traditional location is governed by the License Agreement rather than the standard Franchise Agreement and is tied to the accepted premises within a facility such as an airport, university, military installation, casino, or similar venue. The license is nonexclusive, the License Agreement does not grant a protected territory, and QDOBA may negotiate additional terms based on the facility.
The License Agreement still requires written site acceptance, QDOBA-approved construction and improvements, approved equipment and suppliers, required technology, insurance, and certified training. Before opening, the restaurant manager and at least three other individuals must complete the certified training program. If the licensed restaurant does not begin operating within six months after the License Agreement date, QDOBA may terminate the agreement. Facility approvals, concession terms, and landlord or venue dependencies therefore need to be mapped separately from the traditional real-estate path.
Sources: 2025 FDD Item 1, pp. 2–3; License Agreement §§1, 4–6 and insurance exhibit.
Key disclosed waiting, response, and control periods
FTC disclosure period before signing/payment
14 d
Single-unit site response target after complete package
30 d
Development Agreement site response target
45 d
Possession period after Notice of Site Acceptance
120 d
Opening period after written authorization
15 d
Interpretation: these periods use different triggers and are not additive. The 30- and 45-day figures are QDOBA best-efforts response targets; the 120-day period can affect continued site acceptance, while the 15-day period follows written opening authorization.
Sources: 2025 FDD Item 11, p. 29; Franchise Agreement §§4.4–4.5 and 7; Development Agreement §6.2.5; FTC Franchise Rule, 16 CFR Part 436.
SITE APPROVAL
Who controls each critical opening dependency?
The applicant controls document completeness, financing readiness, site pursuit, landlord negotiations, contractor execution, permits, staffing, training attendance, and procurement. QDOBA controls franchise approval, written site acceptance, brand-plan approval, training satisfaction, and written opening authorization. Landlords, lenders, contractors, suppliers, insurers, utilities, and government authorities can delay work without becoming QDOBA obligations.
Opening responsibility matrix
Applicant / Franchisee
Application package, NDA, ownership disclosures, and financial information.
Market Plan and Real Estate Committee Package where applicable.
Lease pursuit, architect, contractor, insurance, permits, buildout, staffing, and team training.
Qdoba Franchisor LLC
Candidate approval or rejection and applicable agreement package.
Written site acceptance, brand-design review, approved-supplier and technology standards.
Certified management training, readiness review, and written authorization to open.
Third Parties
Landlord: acceptable lease terms and access to the premises.
Government authorities: zoning, building permits, inspections, occupancy and health approvals.
Lenders, contractors, suppliers, insurers, utilities, and technology vendors: delivery on their own schedules.
Source basis: 2025 FDD Item 11, pp. 28–36; Franchise Agreement §§4–9; Item 8, pp. 22–25.
Site approval is not territory protection
A traditional Franchise Agreement generally identifies a Protected Territory around the Accepted Location, but the FDD says the territory is not exclusive and lists carve-outs, including certain non-traditional locations. A Development Area is governed separately by the Development Agreement and development schedule. Written site acceptance only confirms QDOBA accepted that site; it does not guarantee traffic, profitability, lease approval, construction approval, permits, or opening authorization. Source: 2025 FDD, Item 12, pp. 39–41.
OPENING DEADLINE
Which deadlines can put the opening or development rights at risk?
| Trigger |
Period |
Potential consequence |
Evidence |
| Site must be under contract |
By the Site Under Contract Date in Exhibit A |
QDOBA may terminate; Item 11 states fees may not be refunded. |
Item 11 p. 29; FA §4.4 |
| Legal possession after site acceptance |
120 days |
QDOBA may retract site acceptance. |
FA §4.5 |
| Traditional opening after Franchise Agreement execution |
9 months, unless otherwise specified |
Failure to meet the opening covenant can create default risk. |
FA §7 |
| Traditional opening after written authorization |
15 days |
Restaurant must open within this window. |
FA §7 |
| Non-traditional License Agreement |
Begin operating within 6 months |
QDOBA may terminate the License Agreement. |
License Agreement §1 |
| Accepted site under Development Agreement |
1 year after Notice of Site Acceptance |
QDOBA may develop that site; separate Development Deadlines also control quota compliance. |
DA §4.5; Item 12 p. 40 |
A Development Agreement uses a case-specific development schedule in Exhibit A. Missing a Development Deadline is stated to be a default, and the FDD says failure to comply with the development schedule can cause loss of fee credits and potentially termination of development rights and territorial protections. Any extension or waiver should be treated as contractual only if the governing agreement or a signed amendment actually grants it; the FDD does not create a general automatic extension right for development deadlines.
BUYER VERIFICATION
What should a buyer verify before relying on the opening plan?
Ask which format QDOBA will award in the exact market: single-unit Franchise Agreement, Development Agreement, or non-traditional License Agreement.
Confirm the actual Site Under Contract Date, opening deadline, Development Deadlines, Minimum Development Quota, and any written extension terms in the signed exhibits.
Verify who must sign personal guaranties and whether spouse-related obligations are modified by state-specific addenda.
Confirm the complete Real Estate Committee Package, current site criteria, and whether QDOBA requires lease acceptance for the proposed deal structure.
Obtain the current training calendar for the Designated Operator, General Manager, and other required leaders before fixing a scheduled opening date.
Coordinate local zoning, construction, occupancy, health, alcohol if applicable, utility, and inspection requirements with qualified local professionals and authorities.
Confirm the then-current approved suppliers, technology stack, insurance evidence, signage, equipment, and opening-readiness deliverables.
Use Item 20 and Exhibit D contacts to ask current and former franchisees how site review, permitting, training, construction, and opening authorization worked in practice.
Useful official references: QDOBA available territories and inquiry form, QDOBA training overview, and QDOBA flexible buildout information. Contractual requirements remain controlled by the signed agreements and applicable state addenda.
Bottom line. The verified QDOBA opening path is qualification and application, FDD review, execution of the correct agreement structure, written site acceptance and lease/site control, approved design and construction, required permits and systems, certified management training, readiness verification, written QDOBA authorization, and opening within the controlling deadline. The 5–18 month total is an official FDD estimate only for converting an existing structure. The most important applicant-controlled dependency is keeping real estate, permits, construction, staffing, and training aligned; the most important external dependency is timely site/buildout approval plus landlord and government actions. The key dates to verify in the signed documents are the Site Under Contract Date, Franchise Agreement opening deadline, and any Development Agreement schedule.